The 57 leaves Orange at the Orange Crush and comes off the hill at Diamond Bar Boulevard, about 20 miles from our yard on North Tustin Street, so a crew that leaves at 6 is on the pad before 7 and the first load is booked for 8. The city has issued its own permits since it incorporated in 1989, through the Building and Safety Division at City Hall on Copley Drive, and a wall or a footing on a hillside lot is read against the slope before the drawing is stamped.
The first tracts went in along Golden Springs Drive and either side of Diamond Bar Boulevard from 1960, on pads cut into the cattle ranch that gave the city its name, and the streets off Grand Avenue and Pathfinder Road filled in through the 1980s. Most of those houses are two stories on a pad that leaves a strip of level yard at the back, and the pool went into that strip a few years after the house. That strip is the yard we are asked to pour, and the pool's backfill ring is in it.
A pad drains to the street or to the concrete ditch at the top of the slope behind it, and nothing we build may send water anywhere the grading plan did not. So a new patio is pitched the way the pad was, and its low edge is picked up by an area drain piped to the existing outlet rather than left to soak into the fill. Summer is the pouring season. Diamond Bar sits inland of the hills, so from July to September we pour at first light and keep the slab wet all afternoon.