A crew leaves Orange on the 22, comes off at Beach Boulevard and turns south into Westminster, about 10 miles and 25 minutes without a second freeway. The city incorporated in 1957 and its permits come from the Building Division of the City of Westminster at City Hall on Westminster Boulevard. A driveway, walk or patio at grade on your own lot needs none. The approach, the curb cut and anything in the public walk go to Public Works for an encroachment permit, and we file that too.
The tracts either side of Westminster Boulevard and along Bolsa Avenue went up in the same few years, and they share a plan. Garage forward, a short drive to the public walk, a side yard one gate wide, and a back yard the builder left in dirt. That plan sets the method. Anything at the back is barrowed through the gate, so a patio is a two day job where the same slab at the front is one, and the drive is broken out with the neighbor's drive a fence away and the meter in the parkway.
Bolsa Avenue and the streets around it are Little Saigon, and the strip centers there give Westminster a second kind of job, the small commercial lot. A parking apron, a path from the stalls to the door, a set of steps, a dumpster pad. Those pours are 6 inches rather than 4 because of what parks on them, and the path is graded to the state accessibility standard. Midway City, the county pocket in the middle of the city, is permitted by Orange County, and we file there.